Water is still drained at Gei wai #16/17 as of today, 18 Sep 2017.
Can somebody from WWF HK give a progress report as to what re-construction is being carried out there and when will it be water filled again?
Much appreciated!
Author: WWF Mai Po    Time: 22/09/2017 14:26

Hi KK,

GW#16/17 is currently under large-scale restoration work, including restoration of island and desilting of channel.

Originally, the work is scheduled to be concluded at the end of September. Due to the impact from Typhoon Hato, the work is now scheduled to complete by mid-October.

Vegetation will be treated before the GW being refilled.

Regards,
Katherine Leung
Assistant Reserve Manager
Mai Po Nature Reserve
WWF-HK
Author: hkwongkit    Time: 23/09/2017 07:39

Thanks for the update, Katherine!
I look forward to that.
Author: coconutcat    Time: 17/10/2017 15:47

How is GW#16 and 17 now?  Do they filled water now?
Author: WWF Mai Po    Time: 18/10/2017 08:58

The earth moving work is now completed and we have been keeping water level high for controlling the vegetation.

There are some wintering ducks using the GW already. Water level will be resume to normal operation level from this weekend onward.

Thank you very much for your patience.

Regards,
Katherine Leung
Assistant Reserve Manager
Mai Po Nature Reserve
WWF-HK

Author: coconutcat    Time: 18/10/2017 17:31

Quote:
Original posted by WWF Mai Po at 18/10/2017 08:58
The earth moving work is now completed and we have been keeping water level high for controlling the vegetation.

There are some wintering ducks using the GW already. Water level will be resume to nor ...
Excellent! ! Thank you for your reply.
Author: evafun2014    Time: 11/11/2017 19:05

good work!