The floating boardwalk and connecting road have been damaged due to Typhoon Ragasa. The floating boardwalk and all floating hides are temporarily closed for maintenance. The estimated maintenance time takes 1 week. Sorry for any inconvenience that it may cause.
WWF Author: M.L.YIP Time: 4/10/2025 09:47
想請問浮橋修葺工作,進展怎樣呢?
Welcome to HKBWS Forum 香港觀鳥會討論區 (http://www.hkbws.org.hk/BBS/)